Case Study 2: Mold
The School Wing That Couldn't Wait
Situation:
A school in Detroit called about water damage during the holidays. While we were mitigating, we noticed discoloration on the vinyl cove base. Same issue in different areas. One wing. Eight classrooms. A couple bathrooms. All of it needed testing.
Why This Mattered:
Kids. A school full of them, about to come back after the holiday break.
What We Did:
We brought in a third-party hygienist for air samples—because there’s a conflict of interest if we test our own work. The results came back: the entire wing needed mold remediation. The school wanted it done in one week. Tear out to reconstruction.
So we worked every single day over the holidays. Including Thanksgiving. Including the actual holidays.
The Result:
Classes resumed on schedule. No disruption. Kids came back to safe classrooms.
Key Takeaway:
We don't clock out when the problem needs solving. And we don't cut corners on testing just because we're also doing the work. That's how you actually protect people.